Saturday, April 4, 2020

Afcons Infrastructure Limited - Marine And Indutrials

New Sulphur Jetty, Kuwait

Afcons’ first project in the country involved large-scale mobilisation of resources on foreign soil, with material and equipment being procured from nine countries in a record time

Afcons Infrastructure Limited
New Sulphur Handling Berth including approach trestle, erection of equipment, fabrication and erection of piping works, building works related to berth facility and structural steel works
New Owendo International Port, Gabon, Africa

The New Owendo International Port is the fastest port project in Africa.
Afcons completed the job in 18 months for GSEZ
Afcons infrastructure Limited
 Scope: EPC of General Cargo Terminal, consisting of 420m main berth, back up 
yard and other land facilities, including silos for palm oil (10,500T) and food 
grains (10,000T)
Client: GSEZ – Special Economic Zone – Port
Year of Completion: 2017
 
 
LNG Jetty, Dahej, India
 
The project was executed in one of the toughest sea conditions with water 
current ranging from 8 to 10 knots and tide variations ranging up to 11m
 
Afcons Infrastructure Limited
Scope: EPC of LNG receiving Jetty
Client: Petronet LNG
Year of Completion: 2014


 
 
Bulk Jetty, Port of Sohar, Oman

Port of Sohar is one of the world’s deepest ports and the deepwater jetty, with draft of more than 20m, is used to import iron ore. The port can berth the biggest iron ore ships in the world
 
Afcons Infrastructure Limited
Scope: EPC of bulk jetty, approach trestle, mooring and dolphin structures in JV with Saipem, France/Italy 
Client: Sohar International Development Company LLC
Year of Completion: 2011

 
Phosphate Rock Terminal, Aqaba, Jordan

The Phosphate Rock Terminal Project bagged an award for achieving 2 million
safe man hours
 
Afcons Infrastructure Limited
Scope: EPC for export jetty and onshore facilities for receiving bulk carriers
from 5000 to 100,000 DWT. Covered the entire onshore and marine terminal
job from unloading of phosphate rock at the truck terminal, transfer to storage,
and then to the uploading system for carriers
Client: Jordan Phosphate Mines Company (JPMC)
Year of Completion: 2012
 
  
 